The Project, including mobilization and demobilization, consists of furnishing and installing approximately 307 linear feet of 10-inch PVC C900 pipe and zinc coated polyethylene encased ductile iron fittings for a sewage force main along NE 28th Avenue between NE 163rd Street and NE 164th Street; 210 linear feet of 10-inch PVC C900 pipe and zinc coated polyethylene encased ductile iron fittings for a sewage force main along NE 164th Street going west from NE 28th Avenue to PS 468; 392 linear feet of 10-inch PVC C900 pipe and zinc coated polyethylene encased ductile iron fittings for sewage force main along unnamed access road East of Biscayne Boulevard, between NE 163rd Street and 350 feet South of NE 165th Terrace to PS 469; removal of 200 linear feet of existing 6-inch ductile iron pipe aerial canal crossing over existing concrete supports along Oleta River, near the North ROW of NE 163rd Street; and the abandonment in place and grout filling of approximately 3,220 linear feet of 6-inch cast iron force main