1. 1 Lump Sum Mobilization 1-09.7 At ________.__ Lump Sum ________.__ 2. 1 Lump Sum Roadway Surveying 1-05.4 At _______.__ Lump Sum _______.__ 3. 1 Lump Sum SPCC Plan 1-07.15 (1) At _______.__ Lump Sum _______.__ 4. 1 Lump Sum Project Temporary Traffic Control 1-10.5(1) At _______.__ Lump Sum ________.__ 5. 1 Lump Sum Clearing & Grubbing SP 2-01.5 At ________.__ Lump Sum ________.__ 6. 1 Lump Sum Removal of Structures and Obstructions SP 2-02.5 At _______.__ Lump Sum ________.__ 7. 200 Lineal Feet Sawcutting SP 2-02.5 At _______.__ Lineal Foot ________.__ 8. 250 Cubic Yards Excavation, Backfill, Compaction and Grading for Roadway SP 2-03.5 At _______.__ Cubic Yard ________.__ 9. 1 Lump Sum Locate Existing Utilities 2-09.5 At _______.__ Lump Sum _______.__ 10. 275 Tons Crushed Surfacing Top Course SP 4-04.5 At _______.__ Ton ________.__ 11. 550 Tons Crushed Surfacing Base Course SP 4-04.5 At _______.__ Ton ________.__