2.3.1 Minimum 2 full size tractor mowers each equipped with flail attachments with a minimum one-pass cutting width of 10 feet. Any non-flail attachment like a rotary blade is not acceptable. 2.3.2 Minimum Labor responsibility: Two tractor mower operators plus one foreman, who maintains traffic control devices per MUTCD guidelines for mowing operations and provides SHA with tracking of daily cutting acreage. 2.3.3 Finished grass height 3 ½ inches per SHA mowing guidelines. 2.3.4 Contractor shall furnish all supervision, labor, tools, transportation, equipment, and materials necessary to perform all work in accordance with this specification and scope of work in the manner called for, and to the satisfaction of the State Highway Administration. 2.3.5 The contractor shall notify the Contract Manager within 24 hours of any damages caused by the operation to private or State property.