The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 71 EACH Grubbing 31,675 S Y Remove Bituminous Pavement 7,333 L F Remove Curb and Gutter 27,554 C Y Excavation – Common (P) 8,537 C Y Aggregate Base (CV) Class 5 5,684 TON Type SP 9.5 Bituminous Mixture 3,582 TON Type SP 12.5 Bituminous Mixture 5,413 L F 15” – 24” RCP Storm Sewer 1 L S Irrigation System 6 EACH Hydrant 5,526 L F 6”-12” PVC Watermain 354 L F Construct Drainage Structure 16,841 S F 4” Concrete Walk 16,984 L F Concrete Curb and Gutter 20 EACH Lighting Unit Type Special 1 and 2 211 L F Wooden Fence 760 S F Sign 2 SYS Traffic Control Sign System 34 EACH Deciduous Tree 2” Cal B&B 6.7 ACRE Seeding 3,506 L F 4” Solid Line Multi Comp