Specifications include, but are not limited to: 1. Mobilization & demobilization (not to exceed 6% of total Phase 1 bid, excluding bid price for mobilization and demobilization, force accounts, and allowance items). 1 LS $____________ $_____________ 2. General site work, including demolition and removal, clearing and grubbing, stockpiling, regrading of existing onsite select borrow, and other work as designated. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 1 LS $____________ $_____________ 3. Temporary erosion and sediment control and permanent source and treatment control BMP’s, including filter sock, sediment traps, check dams, dissipation devices, stabilized construction entrance, vegetated buffer strips, biofilters, and swales, and other miscellaneous BMPs (construction and postconstruction), inspections, record keeping, NPDES permit and SWPPP compliance, and other incidentals. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 1 LS $____________ $_____________ 4. Probe and grout at the retaining wall and attendant building footing foundations, including 3- inch minimum diameter probes, 10-foot minimum probe depth, 5-foot maximum probe spacing, and excess grout. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 210 EA $____________ $_____________ 5. Excavation and backfills, including import of suitable fill and select borrow, and placing, compacting, and grading materials to meet required base grades. Excavation and export of unsuitable fill as required and proper disposal. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 1 LS $____________ $_____________ 6. Concrete retaining walls, including 4,500 psi concrete, wall section and footing, aggregate base course, reinforcing steel, embedded steel plating, and weep holes and wick drain. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 1 LS $____________ $_____________ 7. 8-inch-thick concrete slabson-grade at refuse roll-off container locations, including 4,500 psi concrete, reinforcing steel, and aggregate base course. Provide all labor, equipment, and materials as necessary to complete the work in-place, complete. 1 LS $____________ $_____________ 8. 8-inch-thick concrete slabson-grade at material storage areas, including 4,500 psi concrete, reinforcing steel, and aggregate base course. Provide all labor, equipment, and materials as necessary to complete the work in-place, 1 LS $____________ $_____________