The following criteria will be used to evaluate the statement of the firms submitting: • 1) Professional training and experience in relation to the type of work required for the routine engineering services - 35 points; • 2) Size of firm, considering the number of professional and support personnel required to perform the type of routine engineering tasks, including project evaluation, project design, drafting of technical plans, development of technical specifications and construction administration – 10 points; • 3) Capacity for timely completion of newly assigned work, considering the factors of type of routine engineering task, current unfinished workload, and person or firm’s available professional and support personnel - 20 points; • 4) Past Performance by person or firm on Parish contracts - 10 points (Assertions of fault by a person or firm, which shall include time delays, cost over-runs, and or design inadequacies in prior work completed for the Parish shall be evidenced by substantiating documentation provided by the Director of Public Works for the requesting department or the Director of Engineering and received by the Chairman of the Evaluation Committee a minimum of two (2) weeks prior to the scheduled date of the Technical Evaluation Committee Meeting.).