Sidewalk Work: Removal: The existing sidewalk will be removed using approved construction methods. Subbase: The subbase will be leveled to grade. Base Material: A 4" layer of compacted material will be placed for the sidewalk base. Debris Removal: Roots and debris will be cleared before placing the base material. Concrete Forms: The forms will be set so that water does not pond or accumulate on the new walkway. Concrete Pouring: The sidewalk will be poured according to the City’s construction standards. Yard Restoration: Once the forms are removed, yard restoration will take place, including leveling off the disturbed areas and spreading organic topsoil and grass seed. Curb & ADA Ramp Work: Removal: Curb and ADA ramps will be removed using approved construction methods. Subbase: The subbase will be leveled to grade. Base Material: A 4" layer of compacted material will be placed for the curb. Curb/Ramp Pouring: The curb and ADA ramps will be poured according to the City’s construction standards. Asphalt Repair: After the curb is installed, any over dig in the roadway will be repaired with asphalt to match the new gutter pan grade. Green Space Restoration: Green space areas will be backfilled with organic topsoil, and grass seed will be spread on disturbed areas. These details give a comprehensive view of the work to be done. If you're preparing a bid, make sure your costs cover all the necessary materials, labor, and restoration work. Sidewalk & ADA Ramps: Bids are to be submitted based on price per square foot for removal, replacement, and restoration. Curb: Bids are to be submitted based on price per linear foot for curb removal, replacement, and restoration.