Unit 2 Nurse Station Specifications: The Contractor shall remove the toilet/sink fixtures and stalls. The Contractor shall jackhammer the concrete to the point of the pipe that would need to be replaced. The Contractor shall hand dig the dirt from under the foundation. The Contractor shall replace the old pipe with new piping. The Contractor shall repair the concrete inside of the building by hand/machine mixing. The Contractor shall repair the mud bed and tile inside of the bathroom. The Contractor shall repair any wall(s) that were damaged, and paint work. The Contractor shall reset new plumbing fixtures and bathroom stalls back to previous floor plan. The Contractor shall comply with all safety standards, especially those pertaining to dust control inside of a health care facility. Kitchen Area Specifications: The Contractor shall remove the sink/fixtures. The Contractor shall jackhammer the concrete to the point of the pipe that would need to be replaced. The Contractor shall hand dig the dirt from under the foundation. The Contractor shall replace the old pipe with new piping. The Contractor shall repair the concrete inside of the building by hand/machine mixing. The Contractor shall repair any wall(s) that were damaged, and paint work. The Contractor shall reset new plumbing fixtures and back to previous floor plan. The Contractor to comply with all safety standards, especially those pertaining to dust control inside of a food preparation/health care facility.