2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY. a. DRAWING INDEX CAN BE FOUND ON PROJECT TITLE PAGE. 3. All Excavating as shown plans. a. This includes Site Demolition Notes 1-5 on Pages C1.01 - C1.09 b. All Site/ Elevation grade changes as shown. i. Prep work for new concrete slabs, concrete paving, footings, and foundations as shown. c. S.E.S.C measures and permits d. Site Drainage as shown. 4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material. 5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work. 6. The CM will provide a one time staking of grades, building footprint, and misc. locations. a. Additional staking will be at the cost of the contractor. 7. Concrete or asphalt cutting to complete work in this scope. 8. Any dewatering necessary to complete this scope of work. 9. Dust control measures for all work in this Bid Category. 10. Daily clean-up at work areas. 11. Contractor to meet Project Schedule, this includes weekend work or daily overtime. a. Project Manager/Project Foreman required to attend the following meetings: i. Pre-Construction Kick Off ii. Bi-Weekly Progress Meeting iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer