All work shall meet National Asphalt Pavement Association industry standards and practices. Finished asphalt surfaces shall be smooth-surfaced with no voids, rough or un-compacted surfaces. Any finished asphalt surface that is not smooth-surfaced shall be removed and replaced with new asphalt by the Contractor. The Contractor shall remove all dirt, loose rocks and other loose debris before overlaying. Areas shall be dry and clean before tack and asphalt is applied by the Contractor. All transitions shall be milled where joined to existing roadways and driveways to maintain a 2” compacted thickness with a smooth and even transition by the Contractor. The five red areas (125 square yards) on the attachment shall be dug out, cleaned, tacked and leveled with 6” of asphalt by the Contractor. The green area (3,175 square yards) on the attachment shall be milled 2", a tack coating (liquid tar) SS18H or equivalent applied and then overlaid with 2” compacted thickness asphalt by the Contractor. Specify Coating Bidding: ______________________ The dark blue area (120 square yards) on the attachment shall be dug out, cleaned, tacked and leveled with 10" of asphalt by the Contractor. Planning and Scheduling: The Contractor shall also include mobilization and demobilization costs. The Contractor shall be responsible for removal of any and all waste material generated by this project.