• Monthly chemical testing of all control and monitoring parameters for all systems treated. • Analytical testing necessary to confirm field tests. • Efficiency monitoring on the boilers, de-aerator, chillers and any other water processing equipment. • Corrosion coupon monitoring on all cooling towers, condensate, feed water and designated closed loops. • Elution studies on all pretreatment a minimum of once per year to check efficiency. • Dissolved oxygen studies on the boiler system de-aerator. • Iron study on condensate systems to determine Amine distribution and corrosion rates. • A complete training program of all operating and management personnel (see below). • Utilization of a web-based logging program with ability to data log from Walchem eControllers on the cooling tower and boiler systems. • Web based operator logs with the ability to trend data and email management when out of specification tests occur. • Monthly test of chilled loop to verify non-oxidizing biocide treatment is controlling bacteria levels in permissible levels established by the water chemistry contractor. • Verify eControllers are operating correctly and corrective action that will be taken to correct any problems.