1. Demolition and removal of buildings and site improvements. 2. Remove driveways of all buildings except 829 East 36th St. 3. Removing below-grade construction. 4. Disconnecting, capping or sealing, and removing site utilities. 5. Remove: Detach items from existing construction and dispose of them off-site. 6. Unless otherwise indicated, demolition waste becomes property of Contractor. 7. Arrange demolition schedule so as not to interfere with operations of adjacent occupied buildings. 8. Review and finalize protection requirements. 9. Review procedures for noise control and dust control. 10. Review procedures for protection of adjacent buildings. 11. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers. 12. Adjacent Buildings: Detail special measures proposed to protect adjacent buildings to remain including means of egress from those buildings. 13. Coordination for shutoff and capping of utility services. 14. Detailed sequence of demolition work, with starting and ending dates for each activity...