PART A Flooring: Flooring demolition includes removal of existing flooring and resilient base as noted at all locations shown on the drawings and prep/repair floor slabs including crack repair as occurs to receive new flooring. The project also consists of new walk-off carpet tile, new rubber tile flooring, new resilient base, and various new flooring transitions. Some touch-up painting as required is included in the scope. PART B Ceilings: Ceiling demolition includes removal of existing suspended acoustical ceiling systems and light fixtures, and salvage of other MEP items in ceilings at locations shown on the drawings. Contractor to coordinate removal of remaining components of existing 12x12 suspended acoustical ceiling systems following abatement of said ceiling systems by separate ownerengaged contractor.