1. The Vendor shall furnish and deliver Duracal or INDOT approved alternate to INDOT locations for use in maintenance operations. Manufacturer: ____________________________ Product offered: __________________________ yes no 2. The rapid setting patch material shall be ready for traffic loading in one (1) hour after the final set. yes no 3. Surface preparation requirements shall be limited to the following: • The surface shall be clean, sound, and free of any materials that may inhibit bond. • The surface shall be roughened. • All unsound material should be removed • Surface shall be thoroughly saturated with no standing water. • A vertical cut at the perimeter of the prepared area. Neither water or abrasive blasting or other means shall be required on surface. yes no 4. The material will be able to be extended with equal amounts by weight of fine aggregate (sand) and coarse aggregate (stone). The provided material would then constitute one third of the dry weight of the extended mix. yes no 5. A minimum of one (1) on the job training per District will be required if requested. yes no 6. The rapid setting patch material shall be on INDOT’s Qualified Materials Lists and Certified Source Lists at the time of bid opening.