• Containment Clean – Dwelling Unit A. Prior to lead-hazard reduction work, set-up containment, in the dwelling unit and/or work area, according to the Federal Rule 40 CFR 745, Subpart E (Lead Renovation, Repair, and Painting Rule). B. Once work is completed, clean the dwelling unit and/or work area, and document the results according to Federal Rule 40 CFR 745, Subpart E (Lead Renovation, Repair, and Painting Rule). • Location/s A. Interior rooms (where work is being performed) B. Contractor Walkways • Cleaning Specifications A. Smooth Floors and Window Components 1. Vacuum the area with a HEPA vacuum 2. Wet wash, with a lead specific detergent, using a single-use paper towel or cleaning wipe 3. Follow with a clean water rinse 4. Vacuum the area, again, with a HEPA vacuum