The Department of Natural Resources is seeking bids for all labor, equipment, materials, tools, transportation, and incidentals necessary to remove and dispose of existing fencing, then provide and install approximately 5,200 linear feet of fence (approximately 2,500-2,700 linear feet on each side of the trail) along the paved bike path of the Harmony Preston Valley State Trail located in Fillmore County. Mowing and/or brushing along part of the trail will be required for installation, approximately 450 ft x 8 ft on the west side of the trail corridor and 550 ft x 8 ft on the east side of the trail corridor, see map on page 27 for mowing/brushing locations. Contractor will be responsible for finding a location to dispose of the existing fence and materials they are removing.