City Project 2025-101, 2025 Street and Utility Improvements 55 EA Clear and Grub Tree 3,150 LF Remove Sanitary Sewer 3,750 LF Remove Watermain 1,480 LF Remove Storm Sewer 7,200 LF Remove Curb and Gutter 46,200 SF Remove Concrete Walk, Driveway, and Valley Gutter 11,350 SY Remove Bituminous Street, Driveway, and Trail Pavement 15 EA Sanitary Sewer Structure 3,170 LF PVC Gravity Sanitary Sewer 50 EA Sanitary Sewer Service 3,900 LF DIP Watermain 50 EA Water Service 34 EA Storm Sewer Structure 2,550 LF RCP Storm Sewer 6,500 CY Common Excavation 3,000 CY Cl 5 Aggregate Base 2,850 TN Bituminous Mixture 6,900 LF Concrete Curb and Gutter 56,000 SF Concrete Walk and Driveway 10,700 SY Sod 2,400 CY Topsoil/Compost 44 EA 2” Diameter Tree With related items.