The work includes preparing the surface of the roadway and protecting existing infrastructure, setting up and operating proper traffic control, providing and installing a chip seal and fog seal according to the requirements herein, removing excess materials and cleaning the roadway as necessary, providing, laying out and installing pavement markings on all areas impacted by the work, and project cleanup. The 2025 Chip Seal Program includes the following roads and streets, also shown on the map included with this RFP. The specific limits at each location will be as directed by the Engineer. • Sherman Boulevard, Beach Street to Lincoln Street • Getty Street, Marquette Avenue to Access Highway • Broadmoor Street, Marquette Avenue to Brusse Avenue • Marquette Avenue, Harvey Street to West Street • Quarterline Road, Marquette Avenue to Stebbins Road