A1 Mobilization / Bonds / Insurance LS 1 $ $ A2 Traffic Control LS 1 $ $ A3 Utility Adjustment LS 1 $ $ A4 SWPP (Sediment Control Fence) LF 70 $ $ A5 SWPP (Erosion Control Log) LF 93 $ $ A6 Remove Existing Street Asphalt SY 1,212 $ $ A7 Remove Existing Concrete SY 10 $ $ A8 Remove Existing Curb & Gutter LF 36 $ $ A9 Remove Existing Concrete Curb LF 48 $ $ A10 Remove Existing Valley Gutter SY 55 $ $ A11 Remove Existing Guard Rail LF 50 $ $ A12 Remove Existing Guard Post EA 2 $ $ A13 Remove Existing Junction Box EA 1 $ $ A14 Remove Existing Post Inlet EA 1 $ $ A15 Remove Portion of Existing 18ӯ RCP LF 42 $ $ A16 Remove Portion of Existing 24ӯ RCP LF 24 $ $ A17 Remove Portion of Existing 36ӯ RCP LF 36 $ $ A18 Remove Portion of Existing 72ӯ CMP LF 340 $ $ A19 Remove Existing Tree EA 1 $ $ A20 H.M.A.C. Pavement SY 1,200 $ $