PHASE 1 - Construction of approximately 46,915 sq ft addition including a GHSA competition gym, a warming kitchen and indoor and outdoor dining areas, and academic wing with a physics lab, a flagship classroom, approximately 10 additional classrooms, student restrooms and common areas, elevator, 8 storage areas, a public entry, and 6 offices/conference rooms. PHASE 2A - Major renovations of approximately 4,600 sq ft of interior space to convert the current cafeteria into student restrooms, and approximately 5 classrooms, and 2 offices PHASE 2B - Major renovations of approximately 9,200 sq ft of interior space to convert the current gymnasium into two stories of academic space to accommodate 2 sets of student restrooms, adult restrooms, a faculty lounge, a recital space, a chemistry lab, a biology lab, a classroom and 3 storage rooms. PHASE 3A - Major renovations of approximately 4,400 sq ft of interior space to convert the current administrative offices and adjacent classroom into a library, clinic, 2 offices, and adult bathrooms. PHASE 3B - Exterior work over approximately 87,000 sq ft including removal of modular buildings and restoration/creation of the area as a turf play field, playground, outdoor classroom, and surface parking, and resurfacing an existing parking lot.