1. Exterior surfaces shall be pressure washed at 3000 psi to insure removal of chalk, mold, mildew, or any other foreign material. Wood surfaces shall be pressure washed at a maximum of 3000 psi. Where needed, other additional approved means, as may be necessary, shall be used to insure removal of all of any other foreign material. 2. All surfaces after having been properly cleaned and de-scaled shall have all joints resealed by proper method and all areas that have been cleaned to the primary surface material shall be spot primed with a minimum of coat primer and coats of finish, allowing an adequate amount of drying time before primary finish is applied. 3. All painted surfaces shall have a minimum of two coats at 150 square feet per gallon. 4. Metal Surfaces: All metal surfaces shall be properly cleaned prior to application of finishing products by sandblasting, wire brush, sanding, water blasting, etc. and prepared for final finishes by applying the appropriate primer for the type of metal. All conduit lines are to be primed and painted. Paint all hand rails. All doors to be finish painted in their entirety, both sides.