1. Review Background Material • Maintenance Facility Space Needs Study • License Center Space Needs Study • Floor Plans for current facilities • Civic Campus Master Plan • Civic Campus Pre-Design Study 2. Data Collection • Department interviews • Site survey/walk through 3. Concept Development • Phase 1 o Provide an updated cost estimate of the proposed LPCDS which is proposed in the CCPDS. o Provide an updated cost estimate of Maintenance Operations Center as proposed in the CCPDS. o Provide cost estimate for a single story LPCDC instead of the two-story plan. o Provide feasibility options to reuse portions of existing MF for LPCDS use. Provide building and site plan layouts and cost estimates. The report should include pros and cons of this option compared to the CCPDS option. The report should also provide information on how this option would affect the overall phasing of the overall project. o Provide feasibility options to reuse portions of existing MF for other uses such as office space, restaurant, or event venue use. Provide building and site plan layouts and cost estimates. The report should include pros and cons of this option compared to the CCPDS option. The report should also provide information on how this option would affect the overall phasing of the overall project. o Provide report and presentation to council. • Phase 2 – Only if authorized after Phase 1, if needed. o Provide two alternative options for LPC on City Campus that would result in a cost savings for the City. o Provide alternative designs to consider for all aspects of the CCPDS. o Provide report and presentation to Council.