GENERAL REQUIREMENTS Traffic shall be maintained by the Contractor throughout the project in accordance with the requirements of Section 104.11, 812 and 922 of the 2020 MDOT Standard Specifications for Construction and as herein specified. The Contractor is advised that the 2011 Edition, as amended, of the Michigan Manual of Uniform Traffic Control Devices is hereby established as governing all work in connection with traffic control devices, barricade lighting, etc., required on this project. The Contractor shall coordinate this work with other contractors performing work within the construction influence area or adjoining areas to avoid conflicts in the maintenance of traffic, construction signing and the orderly progress of work. PROJECT – GENERAL Necessary emergency work performed by the County due to the negligence of the Contractor will be billed against the Contractor. Walks, driveways and entrances to building shall not be unnecessarily blocked. Vehicular access shall be maintained to all properties designated by the Engineer at all times. Construction shall be completed in such a manner as to maintain the required entrance width for traffic at all times. When partial widths of new pavement are available to traffic, access to drives shall be provided immediately.