1. Bituminous Mixtures shall be in accordance with the 2020 Michigan Department of Transportation Standard Specifications for Construction and/or attached Special Provision. 2. The price per ton shall include all material and loading at the plant toRoad Department equipment. 3. The quantity is estimated quantity only and may be increased or decreased with no change in the price per ton. 4. Payment shall be by the ton. All material loaded to Road Department equipment shall have a stamped weight ticket. Handwritten tickets will not be accepted. 5. The bituminous mixture will be ordered by the Berrien County Road Department as needed from various locations. The bid price shall remain firm until November 30, 2025, or when weather requires plants to shut down for the 2025 season. 6. Estimated Quantity is 6,000 tons.