Reconstruction of Main Street from Center Street east to 3rd Avenue and reconstruction of Center Street from State Street to Church Street. 1 VAULT - DEMO VAULT TOP SY 253 $ $ 2 VAULT - DEMO STAIRS SF 32 $ $ 3 VAULT - INFILL OPENING, SINGLE WYTHE, 10 INCH SF 17 $ $ 4 VAULT - INFILL OPENING, SINGLE WYTHE, 12 INCH SF 102 $ $ 5 VAULT - INFILL OPENING, DOUBLE WYTHE, 24 INCH SF 44 $ $ 6 VAULT - WALL OPENING INFILL, 12" CMU SF 66 $ $ 7 VAULT - WALL OPENING INFILL, CONCRETE CF 30 $ $ 8 VAULT - CMU BLOCK WALL, 12 INCH SF 143 $ $ 9 VAULT - CAST IN PLACE WALL AND DOOR INFILL CY 4.6 $ $ 10 VAULT - WALL FOOTING UNDER NEW WALL CY 7.4 $ $ 11 VAULT - WATERPROOF WALL SF 1255 $ $ 12 VAULT - DRILLING HOLES IN CONCRETE FLOOR EA 59 $ $ 13 VAULT - GRANULAR FILL CY 486 $ $ 14 VAULT - STAIR REPLACEMENT EA 2 $ $ 15 VAULT - STRUCTURAL SIDEWALK SY 5.6 $ $ 16 COLLAPSIBLE BOLLARD EA 4 $ $ 17 BOLLARD EA 1 $ $ 18 GATEWAY MONUMENT ARCH LS 1 $ $ 19 BENCH (FURNISH AND INSTALL) EA 3 $ $ 20 BENCH (INSTALL ONLY) EA 3 $ $