temporary trailer office to be delivered no later than June 27th. UMass Dartmoth is looking for space that meet the following requirements: Please see Attachment I for layout: One ADA compliant access ramp is required ADA Restrooms One stair entrance Provide alternate pricing for sanitary holding tank Skirting University will not require any furniture Location on campus will be negotiable based on most efficient and cost-effective solution. University Responsibilities: Connection of all utilities (Water, Electric, Sanitary & Data) Ground preparation based on specifications provided by vendor Vendor Requirements Obtain all required permits Deliver, assemble, weatherize and set in place with code compliant blocking and anchoring Demobilization of trailer and removal from University property Modular Trailer Electrical Requirement: 208V 3 Phase Unit to have central heating and air conditioning that meet Standards and codes for the State of Mass. Data wiring within assembled solution Provide site preparation specifications with your response that include but are not limited to grade leveling, crushed stone, etc. Provide drawings and specifications of modular office proposed that will meet all permitting and code requirements.