Removal and replacement of existing exterior doors throughout the Westwood Community School District. Existing doors are placed in masonry walls and will need to be carefully removed for replacement with new, then masonry patched back to look new. Includes new hollow metal doors and frames as well as new Aluminum doors. Specified doors will need low voltage security measures. Doors are to be bid in priority levels per school, intent is to complete all doors this summer, dependent upon final budget results. SCOPES OF WORK: 02-050 Demolition, 04-200 Masonry, 05-580 Metal Fabrications, 07-900 Joint Sealers, 08-100 Metal & Wood Doors/Frames, 08-800 Glass & Glazing, 09-900 Painting & Wallcovering, 16-100 Electrical, 16-600 Security Systems