Specifications include, but are not limited to: The project is located in Letcher County, KY, along Kentucky Highway 931 near its intersection with Thompson Bridge. A summary of work to be completed includes pre-project planning; completion of a waste determination and disposal arrangements for excavated soil; utility locates; mobilization and setup; clearing of debris from building floor; demolition of building (three (3) concrete block walls, and concrete floor slab; reclamation and stockpiling of concrete/brick materials; recycling/disposal of wood, plastic, metal, etc. demolition debris; excavation of designated petroleum contaminated soil area; direct loading and transport of excavated soil; import, place and compact backfill for placement in petroleum contaminated soil excavation and the depression resulting from removal of the buildings concrete floor slab; placement of topsoil; seed and protect disturbed area; site clearance; and demobilization.