CTH B between CTH R & 1,800 feet east of Kennedy Ave. Phase 1 Length 13,300 feet Width 14’, average depth 2 inch. Phase 1 will consist of milling eastbound and westbound driving lanes (outside lanes). Then pause one week to pave eastbound and westbound driving lanes before continuing milling middle lanes and middle turn lanes.1 milled cross joint on each end of project (2 total). Approximate start date for Phase 1 is August 4,2025. Phase 2 length 19,550 feet width 12’, average depth 2 inches. Phase 2 will consist of milling middle driving lanes and middle turn lanes and crossovers.1 milled cross joint on each end of project (2 total). Approximate start date for Phase 2 is August 18,2025. 2 mobilizations will be needed for total project. Work shall be performed per specifications of ITEM D in Attachment E. Approximate start date August 4, 2025.