The Work includes the replacement of the water main and sewer main along 5th Avenue SW and Garden Way, west of 18th Avenue SW within two schedules of work. Schedule A provides for the replacement of approximately 900 LF of existing 8-inch diameter concrete sewer pipe with 8-inch PVC sewer pipe. In addition, the work will include the installation of four manholes and approximately 14 sewer services to the edge of the right-of-way. Schedule B provides for the replacement of approximately 1,000 LF of existing 1.5-inch and 2-inch diameter galvanized iron water pipe with new 4-inch and 8-inch DI water pipe in a similar location to the existing. Both schedules include associated street repair as required along 5th Avenue SW and Garden Way. Replacement will include trench patching.