The selected architect will serve as the architect-of-record and will manage and coordinate all design and construction document preparation tasks and construction administration responsibilities for this Project. The scope of services shall include but not be limited to the following: 2.2.2.1 Site Planning. a. Provide a site planning and feasibility study consistent with the development of the facilities b. Analysis of existing and required infrastructure systems capacity c. Analysis and design of spaces d. Preparation of a space program for the Project e. Preparation of cost estimate and development timeline 2.2.2.2 Design Development. Scope of services to include: a. Building plans and elevations showing: • Room layout and configuration • Exterior appearance, including materials, finishes & colors b. Update cost estimate and development timeline 2.2.2.3 Preparation of Construction Documents. Scope of services to include: a. Construction documents, drawings, calculations and specifications of sufficient detail to secure agency approval, bid and construct the project b. Construction documents will include architectural design and coordination of engineering design for all buildings that are constructed c. Updated cost estimate based on completed construction documents d. Update cost estimate and development timeline...