1 203.998 Mobilization LS 1 2 203.200 All materials, labor, equipment, and supervision required for the Operations Laboratory & Operations Room Remodel at Haikey Creek WWTP per these specifications. LS 1 3 203.300 All materials, labor, equipment, and supervision required for the Maintenance Building Access & Safety Improvements at Haikey Creek WWTP per these specifications. LS 1 4 203.400 All materials, labor, equipment, and supervision required for the Grit Facility Building Sump Pump Replacement at Haikey Creek WWTP per these specifications. LS 1 5 203.500 All materials, labor, equipment, and supervision required for the Bar Screen Conveyor Trough Liner Replacement at Haikey Creek Lift Station per these specifications. LS 1 6 203.999 Mechanical, Electrical, Plumbing and Unforeseen Circumstances Allowance for various mechanical, electrical, plumbing and unforeseen work not shown on the construction drawings or specified in the contract documents. ALLOW 1