7220-00-09: Perpetuation project, resurface STH 25 0.5 miles (1.5” mill existing concrete & pave 2.5” asphalt). High severity concrete patching; traffic signal modifications; add curb bulb-outs; sidewalk, driveway, curb & gutter; & 1 inlet replacement; remove brick pavers; adjust inlet & manhole covers & water valves; color concrete; curb ramp upgrades; & pavement marking. 7600-00-03: Perpetuation project, resurface USH 12 0.406 miles (1.5” mill existing concrete & pave 2.5” asphalt). High severity concrete patching; intersection modifications; traffic signals, sidewalk, curb & gutter, & inlet replacements; remove brick pavers; adjust inlet & manhole covers & water valves; color concrete; curb ramp upgrades; & pavement marking. 7610-00-09: Perpetuation project, resurface STH 29 0.38 miles (Asphalt Section – 2.5” mill existing asphalt & pave 3” asphalt) & (Concrete Section - 1.5” mill existing concrete & pave 2.5” asphalt). High severity concrete patching; guardrail, spot curb & gutter, sidewalk, & driveway replacement; adjust inlet covers, manhole covers, & water valves; curb ramp upgrades; & pavement marking. 7610-00-08: Perpetuation project, resurface work on STH 29 0.1 miles (1.5” mill existing concrete & pave 2.5” asphalt). High severity concrete patching; sidewalk, driveway, curb & gutter, & inlet replacements; bump out additions; remove brick pavers; adjust inlet covers, manhole covers & water valves; color concrete; remove storm sewer; & curb ramp upgrades.