Specifications include, but are not limited to: 4. New electrical service shall be established from the WRP Main Building to the Storage Garage. An existing 12 conduit existing from the WRP Main Building and daylights in an existing vault. This vault also has an 1 ½ inch conduit which daylights directly west of the storage building. Due to the amount of underground facilities and unsuitable subgrade conditions, contractors are strongly encouraged to utilize the existing conduits. Contractor shall either open cut or directional drill the remaining distance to the storage building. Please note that the drive adjacent to the storage building has frequent heavy truck traffic. 5. Install adequate outlets per code. All outlet locations will be preapproved by engineer or their representative prior to installation. Contractor shall supply unit pricing in their proposal to add additional outlets, and conduit enclosed wiring as needed and allowed for operational needs. All materials shall be ridged enough to withstand the industrial application of the plants.