The following outlines the contractor's general scope of work for repairing the Holly Park Lane cul-desac. All work shall conform to the attached engineer plans. A. Site Assessment and Preparation 1. Utility location 2. Utility conflict resolution 3. Installing and maintaining erosion control measures, traffic control, and project staking 4. Dewatering the channel as needed 5. Limited clearing, grubbing, and excavation B. Removal and Disposal 1. Conflicting trees and stumps 2. Concrete/asphalt driveway and roadway 3. Retaining walls 4. Curb 5. Catch basin and 15" RCP pipe 6. Soil/borrow excavation C. Slope Repair 1. Large rip-rap installation over nonwoven geotextile fabric per the plans 2. Backfill and slope restoration at 2:1 3. Erosion control blanket installation D. Drainage System Repair/Relocation 1. Reconstruct and repave asphalt road 2. Install type 1 road inlet with curb and outfall pipe 3. Tie existing 15" RCP into new inlet box E. Project Wrap Up 1. Removal of any temporary erosion control measures 2. Permanent grassing/stabilization of disturbed areas