3.1. Sharon Drive Culvert Replacement The following outlines the contractor's general scope of work for replacing the Chick Springs Road Culvert. All work shall conform to the attached engineer plans. A. Site Assessment and Preparation 1. Utility location 2. Utility conflict resolution 3. Installing and maintaining erosion control measures, traffic control, and project staking 4. Dewatering the channel 5. Limited clearing, grubbing, and excavation B. Removal and Disposal 1. Conflicting trees and stumps 2. Existing 72" CMP 3. Existing W-beam guardrail 4. Existing asphalt pavement C. Culvert Installation 1. Rip rap installation over nonwoven geotextile fabric per the plans 2. Culvert, headwall, wingwalls, apron, and toe-down installation per the plans 3. Road reconstruction 4. Repaving 5. Compaction, concrete, and asphalt testing D. Project Wrap Up 1. Removal of any temporary erosion control measures 2. Permanent grassing/stabilization of disturbed areas