roposal bids are for the furnishing of all labor and materials and all else necessary for the following: ARGENTA TRAIL RECONSTRUCTION PROJECT, EAGAN PROJECT NO 1377, INVER GROVE HEIGHTS PROJECT NO 2023-09E, Full Depth Reclamation, City Contract No. 25-10 Involving Approximately: 9,620 SY Full Depth Reclamation; 5,600 LF Concrete Curb & Gutter; 2,475 TON Wear Course Bituminous SP Mixture; 1,500 TON Non wear Course Bituminous SP Mixture; 4,540 CY Common Excavation; 1,480 TON Class 5 Aggregate Base; 2,150 LF 12” – 24” RCP Storm Sewer Pipe; 103 LF 28” Span RC Arch Storm Sewer Pipe; 6 EA 2’x3’ and Design H Catch Basin Structures; 151 LF 48” – 72” Catch Basin and MH Storm and Sanitary Structures; 2,992 LF 4” – 12” Watermain; 5 EA Hydrants...