1 Prepare and Implement Water Pollution Control Plan / Best Management Practices 1 LS 2 Prepare and Implement Traffic Control Plan 1 LS 3 Monument Restoration 1 LS 4 2" Cold Mill Existing Asphalt Concrete Pavement 170,000 SF 5 2” Asphalt Rubber Hot Mix (ARHM) Overlay 2,250 TON 6 Type II Rubber Polymer Modified Slurry with 3.0% latex 150 TON 7 Remove and Reconstruct Full Depth (9” +/-) Asphalt Concrete Pavement 12,000 SF 8 Crack Sealing (Alicia Parkway – From City Limits to Santa Margarita Pkwy) 1 LS 9 Crack Sealing (Via Belmonte – From Via Bandada to Cul-de-sac) 1 LS 10 Adjust Storm Drain Manhole to Grade 3 EA 11 Adjust Sewer Manhole to Grade 5 EA 12 Adjust Water Valve to Grade 13 EA 13 Traffic Striping, Markers, and Markings 1 LS 14 Install Loop Detectors 19 EA 15 Portable Changeable Message Sign 2 EA 16 Mobilization (5% max of Base Bid Subtotal) 1 LS