Vendor shall: Provide Two (2) Hydraulic Modernization Services for JPOC 1350 Main Street, Fort Worth, Texas 76104, Passenger Elevators #4 and #5. Provide adequate staffing to perform the work in the specifications as described herein. Assign an Account Manager to the District that will supervise the Elevator Modernization crew that are assigned to this project. Staff to have approved Elevator tradesman on hand when working at any JPS Health Network locations. Provide all transportation, labor, materials, tools, equipment, and supervision necessary to maintain repairs at the district sites listed in Services Locations as specified herein. Perform all work in a first-class professional manner in accordance with the plans, specifications, and recommendations of the equipment and material manufacturers, governing codes, and instructions by the District. Obtain a clear understanding of the scope of work for each work assignment or service call. Account Manager, responsibilities and performance requirements include: Supervise all vendor personnel and subcontractors that may perform tasks on District sites. Contractor shall report to the JPS Facilities Engineering Leadership or equivalent when on JPS property prior to beginning work. The contractor shall maintain 40-hour work week, four (4) days with ten (10) hours or five (5) days with eight (8) hours. Workdays are in harmony with the IEUC workdays of the trade union. Ensure services are performed per specifications for services as described. Staff sufficient technicians to manage the needs of the scope of work. Technicians, mechanics and supervisors shall be properly trained and adhere to the policies outlined by the State of Texas Department and Licensing. Staff full-time office personnel with the ability to contact field crews to relay changes in schedules of problems encountered in the field.