The programming and initial concept design scope of work may include, but is not limited to: Identify and provide EV charging locations for EV vehicles and equipment in multiple campus locations (PHX, DVT & GYR). Identify and provide separate recommendations focused on AVN Fleet and public use EV charging infrastructure. Identify and provide EV Charging Capacity needs (existing and future). Identify and provide options for Level 3 and Level 2 EV chargers that are open protocol (No Sole Sourcing). Identify and provide electrical requirements including Electrical Service Entrance Section(s) (SES) by location, based on needs. Identify and provide options for EV infrastructure monitoring systems that tracks capacity, metering, usage, access control, and trends analysis with dashboards, graphics and other elements as identified. Identify and provide options for integration of the existing AVN Fleet EV charging infrastructure with the EV infrastructure monitoring system. Recommend and provide preliminary system specifications and anticipated production statistics. Recommend and provide an optimized EV infrastructure for maximum energy savings and resiliency. Recommend and provide design that includes consideration for future infrastructure and upgrades where applicable. Recommend and provide preliminary requirements for all anticipated/associated structural, electrical, mechanical, technology, Fire/Life/Safety/Security, and civil design work as required.