THIS PROJECT RESURFACES THIRTEEN (13) SECTIONS OF VARIOUS TIER 2, 3 AND 4ROADWAYS, TOTALING APPROXIMATELY 38.6 MILES, THROUGHOUT FOURTEEN (14) TOWNS IN DISTRICT 5. 23512__ - Hollis - Depot/Broad/Monument Sq 206.1 COMMON STRUCTURE EXCAVATION CY 4.10 304.301 CRUSHED GRAVEL CY 2.10 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 423.10 403.12 HBP-HAND METHOD TON 26.50 410.22 ASPHALT EMULSION FOR TACK COAT GAL 1,899.50 411.3 PLANT MIX SURFACE TREATMENT, PAVER SHIM TON 2,638.20 417. COLD PLANING BITUMINOUS SURFACES SY 897.00 417.1181 COLD PLANING BITUMINOUS SURFACES, 18" WIDE X 1" DEEP LF 1,389.20 604.0007 POLYETHYLENE LINER EA 4.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 4.00 604.52 RECONSTRUCTING/ADJUSTING DRAINAGE MANHOLES LF 4.00 608.2401 4" CONCRETE SIDEWALK SY 6.50 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 1.90 609.5 RESET GRANITE CURB LF 24.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 6.00