The work generally includes but not limited to: Installation of either Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP) cured with ultraviolet light OR Resin-Saturated Felt CIPP Lining Cured with Steam or Hot Water. Pressure Test and Grouting of lateral connections six feet (6’) upstream (post CIPP lining). The estimated sanitary sewer to be lined is 14,502 linear feet with an additional 5 linear feet of drop assembly pipe. The estimated total quantity of sanitary sewer laterals to be tested and sealed is 212. All laterals are six-inch (6”) and mainline pipe sizes include eight-inch (8”), ten-inch (10”), fifteen-inch (15”) diameter, and eighteen-inch (18”) diameter. Pipe material is vitrified clay pipe, reinforced plastic pipe (Truss), and ductile iron pipe. Some segments of pipe may require heavy cleaning prior to lining.