Unit 1: Water Improvements 130 LF – 6” PVC Water Pipe 9,620 LF – 8” PVC Water Pipe 19,000 SY – 11” Pavement Pulverization 19,000 SY – 3” Asphalt Pavement Type D 3,300 LF – 6” Concrete Curb & Gutter 7,000 SY – 6” Concrete Driveway 1,390 SY – 6” Concrete Pavement Unit 2: Sewer Improvements 1,680 LF – 8” PVC Sewer Pipe 330 LF – 8” DIP Sewer Pipe 10 EA – 4’ Manhole Unit 3: Paving Improvements 13,500 SY – 6” Concrete Pavement 5,700 SY – 3” Asphalt Pavement 39,740 SF – 4” Concrete Sidewalk 21,500 SF – 6” Concrete Driveway 600 SF – 8” Concrete Driveway 27 EA – ADA Ramps 75 LF – 21” Storm RCP Unit 3: Paving Improvements Alternate A (POL) 5,000 SY – 11” Pulverization 5,000 SY – 3” Asphalt Pavement Type D 3,000 LF – 6” Concrete Curb & Gutter