1. The services to be furnished by the consultant shall be those necessary to perform survey, database preparation, preliminary construction plans, preliminary and final utility plans, right-of-way plats, staking of the required right of way, and final construction plans including signing, bridge, marking, erosion control, traffic handling, and construction sequence plans and specifications including special provisions for Oak Grove Road project. 2. The work shall consist of complete hydraulic analysis for roadway structures. 3. All engineering activities shall be accomplished in accordance with GA DOT’S Plan Presentation Guide. The geometric details of each roadway shall be prepared to the latest edition of the American Association of State Highway and Transportation Officials, hereinafter referred to as “AASHTO”, GA DOT’S Standard Specifications for the Construction of transportation Systems, Project Schedules, Henry County Design Standards Highway Capacity Manual, AASHTO 2018 Roadside Design Guide and the Manual on Uniform Traffic Control Devices (MUTCD 2009).