The work authorized for the selected wells shall be based on selected combinations of the individual items identified on the response pages and summarized as follows: 1. Traffic Control 2. Palm Beach County Engineering and Public Works Department Land Development Division Water Discharge and Maintenance of Traffic Permitting; 3. Biological Activity Reaction Tests (BART™ Iron Related Bacteria, Slime Forming Bacteria and Sulfate Reducing Bacteria); 4. Specific Capacity Test Before and After Maintenance Work Performed; 5. Step Drawdown Testing; 6. Sand Content Testing (by Rossum Sand Tester) 7. Silt Density Index Testing (SDI); 8. Remove Surficial Aquifer Wellhead, Column Pipe, Submersible Pump and Motor and Appurtenances; 9. Reinstall Surficial Aquifer Wellhead, Column Pipe, Submersible Pump and Motor and Appurtenances; 10. Remove Flowing Artesian Floridan Wellhead, Column Pipe, Submersible Pump and Motor and Appurtenances; 11. Reinstall Flowing Artesian Floridan Aquifer Wellhead, Column Pipe, Submersible Pump and Motor and Appurtenances; 12. Perform Combined Static and Dynamic Down-hole View and Side View Color Video Survey Logging of Surficial Aquifer Well (includes bidder supplied pump for dynamic video survey and recordings provided in triplicate on Digital Video Disc [DVD] or Universal Serial Bus [USB] flash drive media); 13. Perform Combined Static and Dynamic Down-hole View and Side View Color Video Survey Logging of Flowing Artesian Floridan Aquifer Well (includes bidder supplied pump for dynamic video survey and recordings provided in triplicate on DVD or USB flash drive media); 14. Pump and/or Motor Retrieval; 15. Chemical Treatment with 2,500 gallons of 500 ppm Chlorine Solution and Wastewater Chlorine Neutralization for Surficial Aquifer well; Specify National Sanitation Foundation (NSF) approved chemical being used 16. Clean Production Well Casing and Screen with Casing Scrapper and Brush for Surficial Aquifer Well; 17. Clean Monitoring Well Casing and Screen with Casing Scrapper and Brush, Cut and Remove Roots; 18. Brushing, Swabbing and Jetting to Redevelop Surficial Aquifer Well; 19. Furnish and Install Additional Gravel into Production Well Screen Gravel Pack; 20. Well Development by Bidder’s Pump and Flow Meter Capable of 2,000 to 3,000 Gallons Per Minute (gpm) Flow Rate;