The Project includes removal, replacement and/or incidental repairs of Asphalt Shingle and SBS Modified Bitumen Roof Systems including base flashing and sheet metal flashings, trim, gutters and downspouts. Also included is repair, replacement and repainting of exterior building envelope components and trim as well as masonry repairs, restoration and waterproofing of the exterior brick masonry walls. Note that certain components of the building are asbestos containing materials (ACM) that will need to be abated and legally disposed of as well as are coated with lead based paints that will need to be abated, encapsulated, and /or removed and legally disposed of in accordance with regulatory requirements as noted on the drawings and/or specifications. The Project further includes removal and replacement of a majority of the windows with a limited amount of repair and painting of existing window units where noted. Additionally, the project includes replacement of a limited amount of damaged and/or previously removed suspended acoustical ceiling tile finishes, restoration and repair of interior plaster walls, interior gypsum board walls, ceiling and/or floor finishes. The Project will be strictly phased and scheduled to allow for full occupancy and use of the facilities by the Staff and Public.