☒ Traffic Control Lump Sum $ 1 $ ☒ Mobilization/Demobilization to Construction Site. Lump Sum $ 1 $ ☒ Demolish existing structure delineated and install a new junction box structure (Min. dimensions 8’ dia. by 20VF or 8’X8’ X20VF) Vertical Foot $ 20 $ ☒ Reconnect and seal incoming 24” and 54” dia. RCP pipes in addition to outgoing 60” dia. RCP pipe to new junction box structure Each $ 3 $ ☒ Inspect, Clean & Apply Industry Standard, High-Early-Strength, Hydrophilic Grouting Material to Restore SW Conveyance Pipe Joints Each $ 34 $ ☒ Trenchless Rehabilitation of 60” dia. RCP by Spray-Applied Structural Polyurethane Lining or Spin-cast Lining Methodology Linear Foot $ 280 $ ☒ Roadway Pavement Patch (GDOT Standard) approximately 16’ (Length) by 12’ (Wide) Opening to be Paved (Labor, Equipment and Material Lump Sum $ 1 $ ☒ Conduct Post-Construction CCTV Inspection Work Activities and pre and post construction site assessment and documentation. Lump Sum $ 1 $