The General Description and project specifications apply to: new furniture, fixtures, and equipment (FF & E), including, freight, and site work coordination for the demolition and removal of the on first floor circulation desk, reference desk, computer desks the first floor, shelving; installation of circulation desks with solidsurface countertops, circulation work table with solid surface countertop, new computer tables, display furniture; installation of coffee station; installation of teen department desk, teen gaming area furniture and cabinetry, teen computer stations, teen shelving; installation of new and relocation/installation of existing shelving on the first floor; on the second floor installation of three floor to ceiling study rooms; installation of study carrels. On the lower level, demolition and removal of existing countertops; installation of solid surface counter tops on existing circulation desk.