CR 16 MOBILIZATION - 1 LS; REMOVE CATCH BASIN - 1 EACH; SALVAGE CONCRETE APRON - 3 EACH; REMOVE CURB & GUTTER - 20 LF; SALVAGE CONCRETE PIPE CULVERT - 12 LF; AGGREGATE SURFACING CLASS 1 & BASE CLASS 5 – 1,252 TON; DOZER - 3 HOUR; FULL DEPTH RECLAMATION - 28,853 SY; MILL BITUMINOUS SURFACE - 93 SY; TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) – 6,450 TON; PAVEMENT DENSITY INCENTIVE - 1 LS; PAVEMENT SMOOTHNESS INCENTIVE - 34 SEGMENTS; GRANULAR BACKFILL & FOUNDATION &/OR BEDDING - 96 TON; INSTALL CONCRETE APRON - 3 EACH; INSTALL CONCRETE CULVERT - 12 LF; CLEAN PIPE CULVERT - 56 LF; CONNECT TO EXISTING STORM SEWER - 2 EACH; STORM STRUCTURE TYPE 1 - 1 EACH; RANDOM RIPRAP CLASS IV - 36 CY; CONCRETE CURB & GUTTER DESIGN B624 - 20 LF; TRAFFIC CONTROL - 1 LS; STORM DRAIN INLET PROTECTION - 1 EACH; SILT FENCE, TYPE HI - 275 LF; STABILIZED CONSTRUCTION EXIT - 2 EACH; TURF ESTABLISHMENT - 1 LS; ROLLED EROSION PREVENTION CATEGORY 25 – 486 SY; 4" SOLID & DOUBLE SOLID LINE PAINT – 26,889 LF; and Miscellaneous and Appurtenant Items required for a Complete Project. CR 20 MOBILIZATION - 1 LS; REMOVE PIPE CULVERTS - 157 LF; REMOVE GUARDRAIL - 1232 LF; COMMON EXCAVATION - 176 CY