• Selective demolition of ca. 1958 construction for new: Family Lounge/Waiting Rooms Administrative Offices and Meeting/Collaboration Spaces Medical Student Workrooms Shared Staff Breakrooms Public and Staff Restrooms. Other supporting spaces See attached drawings at the end of the document • Specification and installation of new mechanical unit and distribution to all three floors. • OFCI Items (toilet accessories, hand sanitizers, etc.) • Reconfiguring existing fire sprinkler system; • Low Voltage CAT 6A for Telecommunication. Audio visual and data inclusive all related appurtenances needed. • Electrical design and redistribution • Plumbing design • Coordinate Interior signage with Owner, installed by GMH vendor. • See Exhibits B (Narrative) and C (Schematic Design Drawings)